Plant-wide smart logistics
Plant-wide smart logistics
DingAT delivers AGV/AMR, automatic scheduling and human-robot safety for plant-wide smart logistics across industries.
[待核: 实拍素材]
常见物流痛点
Manual handling is slow and night shifts are understaffed — lines stall waiting for materials.
Orders, capacity and materials are managed separately; planners schedule by hand and inserts break the plan.
Mixed human-robot work carries high collision risk and growing safety-compliance pressure.
核心能力
Smart logistics design
Derive material paths and equipment selection from takt time — practical, measurable plans.
AGV / AMR mobile robots
Autonomous navigation and flexible scheduling move materials between shop floor and warehouse.
Production scheduling
Turn orders, capacity and materials into one rolling production plan.
Human-robot safety
Wearable visual markers plus AprilTag let machines proactively avoid people.
量化成效
以下数值为示意占位,正式数据上线前由客户提供。
行业覆盖
交付流程
On-site survey & diagnosis
Map takt time, material flow and pain points; quantify improvement headroom.
Design & simulation
Plan equipment, scheduling and integration — simulate before deployment.
Deployment & commissioning
Phase rollout, integrate with WMS/MES/ERP and validate end-to-end.
O&M optimization
Collect data continuously, tune logistics takt to match capacity.
Hand us your logistics challenge
Tell us your line and scenario — we return a practical plan within 48 hours.