FAQ
Common questions about smart-logistics solutions, AGV/AMR, human-robot safety and cooperation.
Which industries do your smart-logistics solutions cover?
3PL warehousing, manufacturing, new-energy/lithium, cold chain and automotive parts — and we tailor plant-wide plans from your takt time.
What’s the difference between AGV and AMR, and how to choose?
AGV follows fixed paths (magnetic tape/QR) — stable and cost-effective; AMR uses autonomous navigation — more flexible for changing layouts. We select by site and takt.
How does the human-robot safety system protect people?
Wearable visual markers plus AprilTag let robots detect personnel position and posture in real time, slowing down or emergency-stopping by distance zones, per ISO 3691-4 and similar standards.
How long does a typical project take to go live?
Depending on scope, a typical plant-wide plan takes 8–16 weeks: survey 1–2, design & simulation 2–4, deployment & commissioning 4–8, then continuous optimization.
Can you integrate with our existing WMS/MES/ERP?
Yes. We provide standard interfaces and middleware to connect with WMS/MES/ERP, linking materials, orders and equipment status.
How does pricing work?
We quote by scope and equipment count, as a package or phased. Final quote follows a solution diagnosis (figures on this site are illustrative).
How are overseas projects delivered and maintained?
We have local implementation and O&M partners in 12+ countries, with remote diagnosis plus on-site commissioning and pre-positioned spare parts.
How do we start working together?
Leave your line and scenario on the contact page — we return a practical plan within 48 hours, or email lizhiqiang@jtrobots.com directly.